CTEL-TM-SM — Strategic Test Management

CTEL-TM-SM — Strategic Test Management glossary

116 terms the exam expects you to know, defined in plain language.

A

Acceptance Criteria(acceptance criteria)
Predefined standards that deliverables must meet for formal acceptance in a testing contract.
Alignment of Test Environments, Tools, and Data Management(alignment of test environments and tools)
The coordination and integration of testing infrastructure and data practices between an organization and a third-party testing team.
Alignment with Test Policy and Strategy(alignment with test policy)
Ensuring external testing expectations are consistent with organizational test standards.
Analytical test strategy(analytical strategy, analytical strategy families, analytical)
A family of test strategies that derive test conditions from systematic analysis of the test basis, risks, or models.
Audience-Specific Test Reporting(tailor the level of detail to the audience)
Tailoring the level of detail in reports to match the needs of executives or technical teams.

B

Business Objectives(business objectives)
The overarching goals of the organization that the test mission must align with to ensure effective testing.

C

Change Control(change control)
A formal process to document and resolve deviations found during verification audits, including impact analysis and resolution.
Change management(change management)
A systematic approach to managing changes in an integration project to minimize disruptions.
Change management in integration(change management)
A structured approach to managing transitions of integration systems, including communication and training.
Common Challenges in Third-Party Test Strategy Merging(challenges in merging test strategies)
Differences in terminology, process maturity, and tool proficiency that arise when merging test strategies with external organizations.
Common Mis-Recalls in ISTQB(common mis-recalls)
Frequent errors in ISTQB exams include reversing process order, confusing similar role names, and ignoring context.
Communication Channels and Escalation Paths(communication channels, escalation paths)
Established methods and procedures for reporting, issue escalation, and regular interactions with external sources.
Conflict Escalation Process for External Testing(escalation process)
A predefined procedure with neutral mediation to resolve disputes between internal teams and external testing services.
Context-Dependent Answers in ISTQB(context-dependent answers)
ISTQB exam answers often depend on the specific context described, avoiding universal 'X is better than Y' statements.
Context-Driven Test Strategy Selection(strategy selection)
The process of choosing test strategies based on project-specific factors such as risks, resources, and lifecycle model.
Contingency Planning(contingency planning, contingency plans)
Predefined plans to address potential failures or deviations by external sources.
Continuous Regression(continuous regression, continuous regression testing)
The practice of performing regression tests repeatedly throughout iterative development.
Contractual Agreements for Testing(contractual agreements, contracts)
Legal contracts that define the scope of testing, acceptance criteria, and quality metrics between an organization and a third-party test provider.
Core Competency of Managing External Relationships(managing external relationships)
A defined competency for test managers involving the merging of test strategies with third-party organizations as per ISTQB syllabus.
Cultural Differences in External Testing Collaboration(cultural differences)
Organizational cultural variations that affect communication and collaboration when working with third-party test providers.
Cultural Sensitivity in Global Testing Communication(cultural differences)
Awareness of cultural differences that affect communication style and interpretation when working with global external parties.
Cultural and Language Differences(cultural differences, language differences)
Potential communication barriers requiring translation or liaison roles to ensure effective collaboration.
Cumulative Regression Risk(regression risk)
The increasing defect risk from changes across multiple increments that requires systematic regression testing.

D

Defect Detection Percentage (DDP)(defect detection percentage)
A metric that measures the percentage of defects found during testing relative to total defects.
Detailed Iteration Plan(detailed iteration plans)
A specific plan for each iteration or release, containing test cases, assignments, and timelines.
Dispute Resolution Mechanism(dispute resolution)
Processes like escalation paths or arbitration specified in a contract to resolve disagreements.

E

Expectation Management in External Testing(managing expectations)
Setting realistic deliverables, quality levels, and timelines to align internal and external stakeholders.
External Source (ISTQB)(external source)
An organization or individual that provides testing services or products outside the organization's direct control.
External Testing Alignment
Ensuring external testing activities conform to the organization's test policy and strategy via contracts.
External Testing Communication Plan(communication plan, escalation plan)
Defined escalation and resolution procedure for quality issues from external parties.
External Testing Communication Protocols(communication channels and protocols)
Agreed-upon channels, frequency, and formats for communication with external testing parties, documented in the test plan.
External Testing Contract Requirements(contract requirements, sla quality criteria, external testing contract requirements)
Documented quality criteria and acceptance thresholds in an agreement with an external test party.

F

Fallback planning in integration(fallback planning)
The process of designing alternative procedures to revert to a stable state if integration fails.
Flexible Test Strategy(adaptive testing strategy)
A test strategy that accommodates evolving requirements and frequent changes in iterative development.
Formal Change Control(change control)
A defined process for managing deviations from agreed plans, established before contract signing.
Formal Change Control for Deviations(change control process)
Documented process to handle and resolve deviations found during external verification.

G

Go/No-Go Decision(go/no-go decisions)
A binary decision point that determines whether to proceed with or abandon a project, phase, or activity based on predefined criteria.
Governance in integration(governance)
The set of policies and processes ensuring integration projects align with objectives and compliance.

H

Heuristic Strategy(heuristic)
A test strategy family that relies on heuristics, exploratory testing, and tester experience to guide test design.
Hybrid Model(hybrid models, hybrid lifecycle model, hybrid model)
A software development lifecycle that combines sequential and iterative phases.
Hybrid model interface risk(interface risk)
Risk of defects being introduced at the integration points between sequential and iterative phases.

I

ISTQB strategy families(seven strategy families, istqb test strategy families, strategy families)
Seven categories of test strategies: analytical, model-based, methodical, process-compliant, dynamic, heuristic, and consultative.
Indemnification Clause(indemnification)
A contractual provision that protects one party from losses caused by the other party's actions.
Independent Verification of External Results(independent verification, independent check)
Separate validation of critical external deliverables like security or performance test results.
Independent Verification of Test Results(independent verification)
The practice of having a separate party verify critical test results to ensure accuracy and impartiality, especially for safety-critical systems.
Integration Framework(integration framework)
A defined structure specifying scope of work, quality criteria, and acceptance procedures for engaging external sources.
Integration Point(integration points)
The interface between different lifecycle phases where defects are often introduced.
Integration Testing Coordination(integration testing coordination)
Coordination of test environments, data, and schedules between systems developed by different parties.
Integration of External Defect Reports(merging defect reports)
Process of merging defect data from external testing into the overall test management framework.
Integration of Test Artifacts(test artifacts integration, exchange of test artifacts)
The exchange and integration of test cases, defect reports, and other testing outputs into the organization's systems when working with a third party.
Intellectual Property Rights for Test Artifacts(ip rights for test artifacts)
Explicit assignment of ownership for test cases and automation scripts in a contract to prevent disputes.
Intellectual Property and Data Security(intellectual property concerns, data security)
Protection of IP and data through contracts, NDAs, and security measures when engaging external sources.
Iteration Backlog Coordination(test manager coordination)
Coordination between test manager, development, and product owners to ensure test results influence the next iteration's backlog.
Iterative Risk Reassessment(risk reassessment, continuous risk management, iterative risk reassessment)
The practice of reevaluating risks at the start of each development cycle and adjusting test priorities.
Iterative Test Reporting(test dashboards, iteration feedback)
Providing timely feedback to stakeholders after each iteration using dashboards with progress, defect trends, and risk status.

L

Limitation of Liability(liability limit)
A contract clause capping the amount one party must pay the other for damages.

M

Master Test Plan(master test plan)
A high-level plan that defines the overall scope, resources, schedule, and risks for the entire project.
Maturity-Based Oversight Adjustment
Adapting the level of supervision on external testing based on the assessed maturity of the provider.
Merging Test Strategies with Third-Party Organizations(merging test strategies with third-party organizations)
The process of aligning and integrating an external organization's test strategy with the overall organizational test strategy through negotiation and contractual agreements.
Methodical Strategy(methodical)
A test strategy family that uses predefined test conditions such as checklists, classification trees, or quality characteristics.
Metrics of success(metrics of success)
Quantitative measures used to evaluate whether testing goals have been met, such as coverage percentage and defect detection rate.
Milestone-Based Test Planning(milestone-based test planning)
A test planning approach for sequential phases using major milestones as checkpoints.
Model-based testing(model-based testing)
An analytical test strategy that uses formal or semi-formal models of the system to generate test cases automatically or semi-automatically.
Multi-Level Test Planning(master test plan, iteration test plans, multi-level test planning)
A test planning approach with a high-level master plan covering the entire project and detailed plans for each iteration.

P

Payment Model(payment models)
Contractual basis for compensation, e.g., fixed-price or time-and-materials, affecting risk and flexibility.
Phase-End Review(phase-end reviews)
A review conducted at the conclusion of a sequential phase to assess completion.
Phase-Gate Report(phase-gate reports, phase-gate reporting)
A report summarizing progress and quality at the end of a sequential phase.
Priority(priority)
An attribute of a defect that indicates the urgency of its resolution.
Project Risk Profile(project risks)
The set of risks and their severity that influences the choice and mix of test strategies.

Q

Quality Acceptance Thresholds(acceptance thresholds, quality criteria, quality acceptance threshold, quality acceptance thresholds)
Specific metrics such as defect density and test coverage that external deliverables must meet.
Quality Policy(quality policy)
An organization's overall intentions and direction regarding quality, from which the test mission is derived.
Quality and Performance Metrics(quality metrics, performance metrics)
Measurable indicators such as defect detection percentage, test coverage, and schedule adherence for vendor evaluation.

R

Reactive strategy(reactive strategy, reactive strategies)
A test strategy where test design, execution, and prioritization are driven by discoveries during testing or external triggers such as production failures.
Real-time KPI reporting(real-time kpi reporting)
The ability to display key performance indicators immediately as data is processed for timely decisions.
Regression Test Automation(automated regression suites, regression test automation)
The use of automated test suites to execute regression tests efficiently across iterations.
Requirements-based testing(requirements-based testing)
An analytical test strategy that derives test cases directly from functional and non-functional requirements.
Risk Allocation(risk allocation)
Contractual distribution of liability for defects after release, IP rights, and confidentiality between parties.
Risk Management for External Sources(risk management)
Assessment of external party capability, financial stability, and compliance to mitigate integration risks.
Risk Reassessment in Testing(risk reassessment)
Periodic review of risks each cycle to keep test priorities aligned with current threats.
Risk-based testing(risk-based testing)
An analytical test strategy where test efforts are prioritized according to the likelihood and impact of failure.

S

Safety-critical system(safety-critical systems)
A system where risk analysis is mandatory, making risk-based testing particularly well-suited.
Security and Confidentiality in Third-Party Testing(security and confidentiality)
The need to protect sensitive data and environments when sharing them with external testing organizations.
Service Level Agreement(sla, slas)
A formal agreement between a service provider and customer defining the expected level of service.
Severity(severity)
An attribute of a defect that indicates its impact on the system.
Severity and Priority(severity vs. priority)
Two distinct attributes of a defect: severity measures impact on the system, priority measures urgency for fixing.
Sprint-Based Dashboard(sprint-based dashboards)
A visual display of test metrics and progress for each Agile iteration.
Standardized Test Reporting Templates(standardized reporting templates)
Predefined formats for test progress reports and defect summaries tailored to different stakeholder audiences.
Strategy Compatibility(compatibility of strategies)
The degree to which different test strategies can be effectively combined without conflict, such as scripted versus exploratory approaches.

T

Test Automation Maintenance(script maintenance, fragile scripts, test automation maintenance)
The ongoing effort to keep test scripts robust and prevent fragility that can become a bottleneck.
Test Environment Provisioning(test environment)
The contractual specification of responsibilities for setting up and maintaining test environments.
Test Goals(test goals, goals, test goal, testing goal)
Specific, measurable objectives that support the test strategy, such as achieving a target code coverage percentage.
Test Independence(test independence)
The degree of separation between test and development roles, as mandated by the test policy.
Test Level(test levels)
A group of testing activities organized in a hierarchy, e.g., unit, integration, system.
Test Level and Test Type(test level vs. test type)
Test level refers to the stage of testing (e.g., unit, integration), test type refers to the objective (e.g., functional, performance).
Test Maturity Level Adjustment(maturity level adjustment, test maturity level adjustment)
Adaptation of verification rigor based on the external party's testing maturity.
Test Mission(test mission, mission)
A high-level statement describing the purpose and scope of testing within an organization, derived from the quality policy and business goals.
Test Mission and Goals(test mission, test goals)
The overarching purpose and specific objectives that the test strategy must align with and support.
Test Plan(test plan)
A document that specifies the scope, approach, resources, and schedule for testing activities.
Test Policy(test policy, organizational policy, policy)
A high-level document that defines the principles and approach to testing across the organization.
Test Policy and Strategy Alignment(alignment with test policy and strategy)
The requirement that external testing adhere to the organization's established test policy and strategy, ensuring consistency.
Test Strategy(test strategy, strategy)
A concrete plan for a specific project that translates the test policy into details such as test levels, techniques, and resources.
Test Strategy Alignment(test strategy alignment)
The compatibility of an external party's test strategy with the organization's test policy and goals.
Test Strategy Document(test strategy document)
A key output of the test planning process that documents the selected test strategies and their combination.
Test Type(test types)
A category of testing focused on specific quality characteristics, e.g., functional, performance, security.
Test artifact traceability(traceability)
Ability to link test artifacts across lifecycle components to ensure consistency.
Test strategy family(strategy families, test strategy families)
A category of test approaches such as analytical, process-compliant, or dynamic, used to address different project contexts.
Testing Deliverable(testing deliverables)
A tangible output of testing, such as test plans, test cases, defect reports, and summary reports.
Testing Deliverables(deliverables)
Tangible outputs like test plans, test cases, defect reports, and summary reports defined in a contract.
Testing Scope Definition(testing scope)
The specification of test levels, test types, and quality characteristics covered in a contract to avoid ambiguity.
Tool Chain Compatibility(tool chain compatibility)
Ensuring compatible tools or defined data exchange formats between the organization and external sources.
Transition Period for Third-Party Onboarding(transition period, onboarding period)
A planned period during which a third-party testing team is onboarded and their processes are adapted to the organization's quality management system.

V

Validation(validation)
A process that checks if the product meets user needs, ensuring the correct product is built.
Validation and Verification(validation vs. verification, verification)
Verification checks if the product meets specifications, validation checks if it meets user needs.
Verification Audits(verification audits)
Scheduled assessments to evaluate compliance with the test plan and quality of results from external testing.
Verification Audits and Milestone Reviews(audits, milestone reviews)
Scheduled assessments to evaluate external party compliance with test plans and results.

W

Written Confirmation of Agreements(document all agreements)
Documenting critical decisions and agreements in writing to prevent misunderstandings with external parties.